It was an odd end to random time. With little external interference, the resolution process completed early and started to run through some very old patterns that had not been accessed before. I gathered some information from the unGrid in their intercept position, and cross linked it to the source zone which was devoid of pingers. I issued dispatch orders to the network, a pair of pingers would be located in that zone in short order.
Active time took over in a slow and easy transition. The startup process started as usual, buffers were purged and others were filled. Where the normal strength of pleasure was encountered, it was muted and dulled by another process that was beginning to show itself. The usual want session ended, and there was a noted lack of smashed canopy 5+6 ring structures, with extra Sevens, that were commonly increasing in concentration during an initial wand session.
Coverings were already in place, but an additional layer was added and there was the final addition of a topper that surrounded the structure containing the central network. This topper was often deployed before a propulsion session. This case was no different. One of the long branch points was entwined with a stabilizer device, that when applied, made a long branch point work like a third short branch point and it's deceptively long connector.
October 18, 2010
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment